I-85 Bridge Improvement

Installed a series of temporary shoring walls at highway exits.

Carolina Foundation Solutions, LLC completed a bridge improvement project over I-85 South near Blacksburg, SC installing a series of temporary shoring walls at exits 100, 102 and 104 . Approximately 80 soil screws were installed at exit 100, 100 soil screws were installed at exit 102 and 70 soil screws were installed at exit 104. The general contractor made 5 ft cuts along the length of the shored area (the lift) and soils screws were installed every 5 ft. by Carolina Foundation Solutions. The wall was then covered with a welded wire fabric and 4 inches of shotcrete.

Our Projects

Project Specs

 

I-85 Bridge Improvement

80 Soil Screws Installed

Added 4 Inches of Shotcrete