Carolina Foundation Solutions expert crew was dispatched to South Lakes Elementary School in Fuquay Varina, NC to address void and settlement issues. To correct this issue they injected polyurethane foam at both a depth of 8 feet and 4 feet to fill any voids underneath the 70-foot concrete slab. They then doubled back to inject another layer of polyurethane foam to address the settlement issues effectively lifting the slab and pushing it back up to flush.