post img
Pier Caps Parr Construction

Continue Reading  
post img
I-85 Soil Screw Wall System

Installed a series of temporary shoring walls at highway exits. Carolina Foundation Solutions, LLC completed a bridge improvement project over I-85 South near Blacksburg, SC

Continue Reading  
post img
Soil Screw Walls

Carolina Foundation Solutions installed a soil screw wall at two residences in Cary, NC where the failure of a segmental block wall resulted in two

Continue Reading  
post img
Deep Foundation Polyurethane Foam Injection

New asphalt road was showing signs of settlement due to uncompacted fill dirt below the compacted subgrade beneath the asphalt. CFS injected polyurethane foam into

Continue Reading  
post img
Laurinburg, NC Railroad Bridge

Carolina Foundation Solutions installed eight grouted anchors through existing shoring to lock shoring in place for a new bridge over wetland area for railroad in

Continue Reading  
post img
Interior Helical Underpinning

Carolina Foundation Solutions installed helical piers inside of the Firestone Fibers & Textiles Plant in Kings Mountain, NC. as a means to support and stabilize

Continue Reading  
post img
Soil Screw Walls

Addressed a failure of segmental block walls in two separate houses. Carolina Foundation Solutions installed a soil screw wall at two residences in Cary, NC

Continue Reading  
post img
Townhome New Construction - Helical Piles & Micropiles

Our expert crews installed 162 helical piles and drilled 23 micro-piles, which were the perfect solution for this site which required deep foundations due to

Continue Reading